The first FLS TIC set ran for approximately 42 days and processed about 540,000 tonnes. This outperformed the previous third-party TIC set at roughly 36 days and 450,000 tonnes, an improvement of around 17% in days and about 20% in tonnes. Versus the earlier 18% Mn baseline of approximately 24 days and 300,000 tonnes, the improvement was close to 75% in days and up to 80% in tonnes.
Execution within a planned window helped avoid additional downtime and changeout risk while supporting steadier production.
The FLS difference
FLS applies OEM-level metallurgy and profile engineering to target specific wear mechanisms, validated on site with measured end-of-life condition. The focus is lifecycle value: longer campaigns, fewer changeouts and more predictable throughput, delivered through proven TIC know-how, disciplined monitoring and safe execution.